The Marmaray Project
The Project provides an upgrading of the commuter rail system in
Istanbul, connecting Halkali on the European side with Gebze on the
Asian side with an uninterrupted, modern, high-capacity commuter rail
system.
Railway tracks in both sides of Istanbul Strait will be connected to
each other through a railway tunnel connection under the Istanbul
Strait. The line goes underground at Yedikule, continues through the
Yenikapi and Sirkeci new underground stations, passes under the
Istanbul Strait, connects to the �sk�dar new underground station and
emerges at S�g�tl��esme.
This Project is one of the major transportation infrastructure
projects in the world at present. The entire upgraded and new railway
system will be approximately 76 km long. The main structures and
systems; include the immersed tube tunnel, bored tunnels,
cut-and-cover tunnels, at - grade structures, three new underground
stations, 37 surface stations (renovation and upgrading), operations
control centre, yards, workshops, maintenance facilities, upgrading of
existing tracks including a new third track on ground, completely new
electrical and mechanical systems and procurement of modern railway
vehicles.
For more details please pay a visit to the project website :
www.marmaray.com
G�nderen Merkal zaman: 9:29 AM
No comments:
Post a Comment